Scan-to-BIM is now cheaper than being wrong once

Technology · 19 March 2025

Terrestrial laser scanning used to be reserved for projects where accuracy was worth an unusual premium. Equipment and processing costs have fallen far enough that the calculation has inverted.

A scan of a 60,000 square foot existing building runs a small fraction of what one serious field conflict costs to resolve during construction, once you count the change order, the schedule impact and the coordination time. On a water reclamation plant upgrade last year, 340 scan setups produced a point cloud that carried the entire design. Process piping tie-in conflicts in the field: zero.

The secondary benefit is arguably larger. The point cloud does not expire when the project ends. It becomes an asset record the owner keeps, and the base drawing for whatever gets done to the building next.

Keep reading

14 July 2025

Why your ALTA survey is late, and what to do about it

Nine times out of ten the delay is not fieldwork. It is the title commitment arriving without the underlying easement documents.

Surveying
02 May 2025

Stormwater decides your site plan. Design it first.

Basin location is not a detail to resolve after the buildings are placed. On most sites it is the strongest constraint you have.

Engineering

Start here

Tell us about the site.
We will tell you what it will carry.

Feasibility conversations are free and usually short. Bring an address and a rough idea of the programme.

Start a conversation